1. The histogram in Figure 1 shows the time, to the nearest minute, that a random sample of 100 motorists were delayed by roadworks on a stretch of motorway - Edexcel - A-Level Maths Statistics - Question 1 - 2012 - Paper 1

Question icon

Question 1

1.-The-histogram-in-Figure-1-shows-the-time,-to-the-nearest-minute,-that-a-random-sample-of-100-motorists-were-delayed-by-roadworks-on-a-stretch-of-motorway-Edexcel-A-Level Maths Statistics-Question 1-2012-Paper 1.png

1. The histogram in Figure 1 shows the time, to the nearest minute, that a random sample of 100 motorists were delayed by roadworks on a stretch of motorway. (a) Co... show full transcript

Worked Solution & Example Answer:1. The histogram in Figure 1 shows the time, to the nearest minute, that a random sample of 100 motorists were delayed by roadworks on a stretch of motorway - Edexcel - A-Level Maths Statistics - Question 1 - 2012 - Paper 1

Step 1

Complete the table.

96%

114 rated

Answer

To complete the table based on the histogram provided in Figure 1:

  • For the delay interval 7 – 8 minutes, we count the number of motorists from the histogram. The frequency density for this interval is about 10, and since this interval represents 1 minute, the number of motorists is:

    = 10.

  • For the delay interval 16 – 20 minutes, the frequency is 5. Thus, the number of motorists is:

The completed table is:

Delay (minutes)Number of motorists
4 – 66
7 – 810
921
10 – 1245
13 – 159
16 – 205

Step 2

Estimate the number of motorists who were delayed between 8.5 and 13.5 minutes by the roadworks.

99%

104 rated

Answer

To estimate the number of motorists delayed between 8.5 and 13.5 minutes, we consider:

  • From the histogram:
    • For the interval 9 minutes, there are 21 motorists.
    • For the interval 10 – 12 minutes, there are 45 motorists.
    • For the interval 13 – 15 minutes, there are 9 motorists.

Calculating:

  • The delay between 8.5 and 9.5 minutes (midpoint) approximately corresponds to 21 motorists.
  • The delay from 9.5 to 11.5 minutes (a stretch within 10 – 12 minutes) corresponds to 45 motorists.
  • From 11.5 to 13.5 minutes (the upper limit), it can be assumed to be close to half of 9 (which is 4.5 motorists)

To sum up:

ext{Estimated Number} = 21 (8.5 to 9.5) + 45 (9.5 to 11.5) + 4.5 (11.5 to 13.5) = 70.5 

Thus, the estimated number of motorists delayed between 8.5 and 13.5 minutes is approximately 69.