Photo AI
Question 3
Figure 4 shows a hydroelectric power station. Electricity is generated when water from the reservoir flows through the turbines. 03.1 Write down the equation which... show full transcript
Step 1
Step 2
Step 3
Step 4
Step 5
Answer
The hydroelectric power station has a maximum power output of 1.5 × 10⁹ W, which is significantly less than the increased demand that peaks above this output during the specified time frame.
The demand remains high for longer than the maximum output duration of 5 hours, making it impossible for the power station to continuously meet the demand spike.
Report Improved Results
Recommend to friends
Students Supported
Questions answered