Photo AI

Last Updated Sep 26, 2025

River Management - Hard and Soft Engineering - Case Study Simplified Revision Notes

Revision notes with simplified explanations to understand River Management - Hard and Soft Engineering - Case Study quickly and effectively.

user avatar
user avatar
user avatar
user avatar
user avatar

393+ students studying

3.3.6 River Management - Hard and Soft Engineering - Case Study

Hard and Soft Engineering

Hard and Soft Engineering

The UK can receive heavy amounts of rainfall and this has caused many floods to different areas. Whilst we obviously cannot stop the rain, many strategies have been implemented to try and prevent floods from occurring or limiting the impacts of them. The 2 main types of preventing flooding are called Hard and Soft Engineering strategies.

infoNote

Hard Engineering involves using man-made structures to prevent or control natural processes from taking place. This form of flood management is usually very expensive.

infoNote

Soft Engineering does not involve building artificial structures, but takes a more sustainable and natural approach to managing the potential for river flooding.

MethodWhat is itAdvantagesDisadvantages
Dams and reservoirsThe dam traps water, which builds up behind it, forming a reservoir. Water can be released in a controlled way.• Can be used to produce electricity by passing the water through a turbine within the dam.
• Reservoirs can attract tourists.
• Very expensive.
• Dams trap sediment which means the reservoir can hold less water.
• Habitats are flooded often leading to rotting vegetation. This releases methane which is a greenhouse gas.
• Settlements are lost leading to the displacement of people.
River straightening and dredgingStraightening the river speeds up the water so high volumes of water can pass through an area quickly. Dredging makes the river deeper so it can hold more water.• More water can be held in the channel.
• It can be used to reduce flood risk in built-up areas.
• Dredging needs to be done frequently.
• Speeding up the river increases flood risk downstream.
EmbankmentsRaising the banks of a river means that it can hold more water.• Cheap with a one-off cost
• Allows for flood water to be contained within the river.
• Looks unnatural.
• Water speeds up and can increase flood risk downstream.
Flood relief channelsThe floodwater flows into the relief channel and is taken either to an area where it can be absorbed, or re-enters the river further down its course.• Removes excess water from the river channel to reduce flooding.• Expensive to build.
• If water levels continue to rise, the relief channel may also flood.
Floodplain zoningAllowing only certain land uses on the floodplain reduces the risk of flooding to houses and important buildings.• More expensive buildings and land uses are further away from the river, so have a reduced flood risk.
• Less damage is caused, leading to fewer insurance claims.
• Not always possible to change existing land uses.
• Planners have to decide what type of flood to plan for.
Flood WarningsThe Environment Agency warns people in advance• Warnings give people time to evacuate• Warnings don't stop a flood from happening.

Flooding Case Study – Somerset 2014

Location

  • Somerset is located in SW England.
  • In January 2014, Somerset experienced floods greater than any other in living memory.
  • Estimates suggest that 10% of the area was underwater.
image

Causes of the Flood

  • Quick succession of prolonged Atlantic storms with persistent rainfall and gale-force winds.
  • January 2014 was the wettest January since records began with 350mm of rain (100mm above average).
  • Storms hit during high tides, causing a storm surge and worsening coastal flooding.
  • Rivers hadn't been dredged, reducing their capacity to carry water.

Social Impacts

  • 600 houses were flooded, and 16 farms were evacuated.
  • Villages were cut-off, and residents needed to be evacuated.
  • Power supplies were cut, and phone lines were damaged.

Economic Impacts

  • Somerset Council estimated the cost of the flooding to be ÂŁ10 million.
  • 14,000 Ha of agricultural land was lost.
  • 1000 livestock were killed.
  • Fuel used to power emergency pumps cost ÂŁ200,000 per week.
  • The Somerset floods cost the tourism industry ÂŁ200 million.

Environmental Impacts

  • Floodwaters were contaminated with sewage.
  • Stagnant water was toxic and had to be treated before being pumped back into rivers.
  • It took over two years to restore the soil before crops could be grown.

Short Term Responses

  • 65 pumps were used to drain 65 million mÂł of floodwater.
  • 40 Royal Marines issued sandbags and distributed food.
  • Rescue boats were used to help stranded people by the fire brigade.
  • The Government pledged ÂŁ15 million immediate aid for temporary flood barriers.
  • The Environment Agency issued several flood warnings for the area.

Long Term Response – New Flood Defences

  • A new Flood Defence scheme was introduced as part of a 20-year plan for the Somerset Levels, costing ÂŁ100 million.
  • Defences included the construction of a tidal barrage and additional permanent pumping stations.
  • 8km of the River Tone and Parrett were dredged, increasing capacity.
  • Culverts (large drains) were added to major roads, and 4 roads were raised.
Books

Only available for registered users.

Sign up now to view the full note, or log in if you already have an account!

500K+ Students Use These Powerful Tools to Master River Management - Hard and Soft Engineering - Case Study

Enhance your understanding with flashcards, quizzes, and exams—designed to help you grasp key concepts, reinforce learning, and master any topic with confidence!

220 flashcards

Flashcards on River Management - Hard and Soft Engineering - Case Study

Revise key concepts with interactive flashcards.

Try Geography Flashcards

24 quizzes

Quizzes on River Management - Hard and Soft Engineering - Case Study

Test your knowledge with fun and engaging quizzes.

Try Geography Quizzes

29 questions

Exam questions on River Management - Hard and Soft Engineering - Case Study

Boost your confidence with real exam questions.

Try Geography Questions

27 exams created

Exam Builder on River Management - Hard and Soft Engineering - Case Study

Create custom exams across topics for better practice!

Try Geography exam builder

12 papers

Past Papers on River Management - Hard and Soft Engineering - Case Study

Practice past papers to reinforce exam experience.

Try Geography Past Papers

Other Revision Notes related to River Management - Hard and Soft Engineering - Case Study you should explore

Discover More Revision Notes Related to River Management - Hard and Soft Engineering - Case Study to Deepen Your Understanding and Improve Your Mastery

96%

114 rated

River Landscapes in the UK

Changing River Shape - River Profiles and Erosion

user avatar
user avatar
user avatar
user avatar
user avatar

408+ studying

185KViews

96%

114 rated

River Landscapes in the UK

Fluvial Landforms - Caused by Erosion

user avatar
user avatar
user avatar
user avatar
user avatar

477+ studying

200KViews

96%

114 rated

River Landscapes in the UK

Fluvial Landforms - Caused by Deposition

user avatar
user avatar
user avatar
user avatar
user avatar

432+ studying

181KViews

96%

114 rated

River Landscapes in the UK

UK River: River Tees - Case Study

user avatar
user avatar
user avatar
user avatar
user avatar

468+ studying

190KViews
Load more notes

Join 500,000+ GCSE students using SimpleStudy...

Join Thousands of GCSE Students Using SimpleStudy to Learn Smarter, Stay Organized, and Boost Their Grades with Confidence!

97% of Students

Report Improved Results

98% of Students

Recommend to friends

500,000+

Students Supported

50 Million+

Questions answered