The sketch shows portion of the roof and external wall of a single-storey dwelling house - Leaving Cert Construction Studies - Question 1 - 2014
Question 1
The sketch shows portion of the roof and external wall of a single-storey dwelling house.
The house has an internal span of 6.0 metres. The external wall is of
timbe... show full transcript
Worked Solution & Example Answer:The sketch shows portion of the roof and external wall of a single-storey dwelling house - Leaving Cert Construction Studies - Question 1 - 2014
Step 1
To a scale of 1:10, draw a vertical section through one external wall and one rafter length.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Begin by setting the scale to 1:10.
Draw a vertical line representing the external wall, indicating a height of approximately 2.4 meters (240 cm) based on standard ceiling heights.
Illustrate the timber frame construction using labeled lines for the 200 mm timber frame inner leaf and the rendered concrete block outer leaf.
Indicate a 60 mm service cavity between the inner and outer leaves.
Next, draw the rafters beginning at the ridge, extending down to the eaves. Each rafter should reflect a pitch of 30 degrees.
Include a section of the roof showing the slate tiles, ensuring to depict three courses at the eaves.
Clearly illustrate ventilation openings, labeled to indicate their purpose.
Step 2
Indicate clearly the design detailing to ensure airtightness at the junction of the ceiling and the external wall.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
At the junction of the ceiling and the external wall, include a clear illustration of the insulation levels, detailing where the insulation is placed in relation to the wall and ceiling junction.
Show the use of vapor barriers, positioned adequately to prevent moisture ingress. This is typically located on the warm side of the insulation.
Indicate any treatment for sealing joints, such as using sealant around the perimeter of the ceiling joists where they meet the wall.
Highlight the use of materials like OSB or plywood with taped joints for added airtightness.
Label all components to enhance clarity and demonstrate best practices for achieving airtightness.
Join the Leaving Cert students using SimpleStudy...