FIGURE 5.1 below shows the incomplete installation of a rain-water system that channels water away from the roof of a building. 5.1.1 What is used to close the end a... show full transcript

Worked Solution & Example Answer:FIGURE 5.1 below shows the incomplete installation of a rain-water system that channels water away from the roof of a building - NSC Civil Technology Civil Services - Question 5 - 2023 - Paper 1

Step 1

What is used to close the end at A?

96%

114 rated

Answer

To close the end at A, stop ends or end caps are used. These components are designed to fit securely at the opening of the downpipe to prevent water from spilling out and to direct it efficiently into the drainage system.

Step 2

Name the component that should be used to attach B to the wall.

99%

104 rated

Answer

The component that should be used to attach B to the wall is a holder bat. Holder bats act as supports, anchoring the downpipe securely against the wall, ensuring stability and proper alignment.

Step 3

Name the pipe that connects A to B.

96%

101 rated

Answer

The pipe that connects A to B is referred to as the offset pipe. It directs the water flow between the two points, allowing for a proper connection between the guttering system components.