Identify FIGURE B - NSC Civil Technology Civil Services - Question 2 - 2018 - Paper 1
Question 2
Identify FIGURE B.
What date was the plan printed?
Who drew the building plan?
Name the feature in the column for the notes in FIGURE 2 that must be installed in ... show full transcript
Worked Solution & Example Answer:Identify FIGURE B - NSC Civil Technology Civil Services - Question 2 - 2018 - Paper 1
Step 1
Identify FIGURE B.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
FIGURE B represents a ground floor plan or floorplan.
Step 2
What date was the plan printed?
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The plan was printed on 2018/10/02.
Step 3
Who drew the building plan?
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The building plan was drawn by JP Maloi.
Step 4
Name the feature in the column for the notes in FIGURE 2 that must be installed in front of the sliding door.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The feature is a ramp.
Step 5
Identify the type of roof that is used for the building in FIGURE A.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The building in FIGURE A uses a gable roof.
Step 6
Explain the purpose of number 1.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 1 serves to cover the opening/collapse the gap between the two slopes of the roof, preventing water and other elements from entering.
Step 7
Explain the purpose of number 2.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 2 is meant to prevent water from falling onto the ground, collect rainwater, channel the rainwater into the downpipe, protect the wall from water, and hide the raters/finish off the roof.
Step 8
Explain the abbreviation FFL at number 6.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
FFL stands for Finished Floor Level.
Step 9
Explain the purpose of number 7.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 7 channels the water from the gutter to the ground.
Step 10
What room will feature 15 serve?
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Feature 15 will serve the bathroom.
Step 11
Explain the short dash lines on the windows.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The short dash lines indicate which direction the window is opening, the location of the hinges, and the location of the casement stay.
Step 12
Deduce the height of window 2 from the window schedule.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The height of window 2 is 1,200 mm or 1.2 m (ignoring units).
Step 13
Deduce the width of window 3 from the window schedule.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The width of window 3 is 2,000 mm or 2 m (ignoring units).
Step 14
On what elevation of the building is the bathroom window situated?
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The bathroom window is situated on the western elevation or western side of the building.