1.1 Various options are provided as possible answers to the following questions. Choose the answer and write only the letter (A–D) next to the question numbers (1.1.... show full transcript

Worked Solution & Example Answer:1.1 Various options are provided as possible answers to the following questions - NSC Civil Technology Civil Services - Question 1 - 2023 - Paper 1

Step 1

1.1.1 Electroplating is the process of ...

96%

114 rated

Answer

The correct answer is B, which states that electroplating involves coating a metal with another metal using electrolysis.

Step 2

1.1.2 The process of keeping freshly cast concrete damp will ...

99%

104 rated

Answer

The correct answer is B, as keeping freshly cast concrete damp helps to make it more watertight, which is essential for strength and durability.

Step 3

1.1.3 Why would you coat a metal with a layer of paint?

96%

101 rated

Answer

The correct answer is D, because the primary reasons for coating metal with paint are to resist extreme temperatures, prevent corrosion, and prevent warping. Both A and B are valid.

Step 4

1.1.4 The minimum size of a wooden scaffold plank:

98%

120 rated

Answer

The correct answer is C, as it specifies that the minimum size of a wooden scaffold plank should be 150 mm wide x 20 mm thick.

Step 5

1.1.5 When using a scaffold, it must be inspected to ensure that ...

97%

117 rated

Answer

The correct answer is D, which indicates that the scaffold must be free from defects, not attached to the building, and supported every 4 m.

Step 6

1.1.6 ... of scaffolds should be secured vertically.

97%

121 rated

Answer

The correct answer is C, identifying that standards are crucial for securing scaffolds vertically.

Step 7

1.1.7 The guard rail on a scaffold will ensure that ...

96%

114 rated

Answer

The correct answer is A, which ensures that a worker does not fall from the scaffold.

Step 8

1.1.8 Toe boards must be at least 150 mm high from the level of the ...

99%

104 rated

Answer

The correct answer is A, confirming that toe boards must be 150 mm high from the scaffold platform.

Step 9

1.1.9 The employer must ensure that the rungs of wooden ladders are ...

96%

101 rated

Answer

The correct answer is D, ensuring that the rungs of wooden ladders are not painted, free from grease, and not cracked.

Step 10

1.1.10 The material safety data sheet for hazardous chemicals must have the following information:

98%

120 rated

Answer

The correct answer is A, which includes the quantity in the container as essential information.

Step 11

1.1.11 Stairways must be installed at a minimum of ... degrees from the horizontal.

97%

117 rated

Answer

The correct answer is B, indicating that stairways must be installed at a minimum of 30 degrees from the horizontal.

Step 12

1.1.12 The purpose of the builder's hoist is to transport ...

97%

121 rated

Answer

The correct answer is A, which identifies that a builder's hoist is designed to transport workers and materials.