5.1 Give ONE word(s)/term for EACH of the following descriptions by choosing a word(s)/term from the list below - NSC Civil Technology Civil Services - Question 5 - 2018 - Paper 1

Question icon

Question 5

5.1-Give-ONE-word(s)/term-for-EACH-of-the-following-descriptions-by-choosing-a-word(s)/term-from-the-list-below-NSC Civil Technology Civil Services-Question 5-2018-Paper 1.png

5.1 Give ONE word(s)/term for EACH of the following descriptions by choosing a word(s)/term from the list below. Write only the word(s)/term next to the question num... show full transcript

Worked Solution & Example Answer:5.1 Give ONE word(s)/term for EACH of the following descriptions by choosing a word(s)/term from the list below - NSC Civil Technology Civil Services - Question 5 - 2018 - Paper 1

Step 1

5.1.1 This fitting can be used to seal off the gutter at the ends

96%

114 rated

Answer

The appropriate term for this description is Stop end.

Step 2

5.1.2 One factor to consider before installing a flashing

99%

104 rated

Answer

A key factor to consider is the Pitch of the roof.

Step 3

5.1.3 A material that can be used for flashings

96%

101 rated

Answer

The material suitable for flashings is Galvanised sheet metal.

Step 4

5.1.4 This part collects rainwater flowing from the roof

98%

120 rated

Answer

The term that describes this part is Gutter.

Step 5

5.1.5 A raised edge on the road that guides water to storm-water drains

97%

117 rated

Answer

This raised edge is known as a Kerb.

Step 6

5.2.1 Square gutter

97%

121 rated

Answer

Draw a Square gutter, ensuring it connects properly to the drainage system.

Step 7

5.2.2 Down-pipe with offset

96%

114 rated

Answer

Illustrate the Down-pipe with offset to show the accurate angle and connection.

Step 8

5.2.3 Holderbat

99%

104 rated

Answer

Include the Holderbat in the drawing to secure the gutter system in place.

Step 9

5.3 Draw the development of the cone

96%

101 rated

Answer

Using the provided dimensions and shape, draw the development of the cone with a focus on:

  • Constructing lines to top of cone
  • Outer circle divisions in 12 parts
  • Marking measuring points accurately to ensure a seamless development. Remember to include the 3 mm seam on both sides.