3.1 State TWO methods that are used to prevent inhaling dangerous fumes in a manhole - NSC Civil Technology Civil Services - Question 3 - 2021 - Paper 1
Question 3
3.1 State TWO methods that are used to prevent inhaling dangerous fumes in a manhole.
3.2 Describe TWO aspects that must be determined when setting out and excavati... show full transcript
Worked Solution & Example Answer:3.1 State TWO methods that are used to prevent inhaling dangerous fumes in a manhole - NSC Civil Technology Civil Services - Question 3 - 2021 - Paper 1
Step 1
State TWO methods that are used to prevent inhaling dangerous fumes in a manhole.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Wear a respiratory mask: This ensures that harmful fumes are not inhaled directly.
Use an extractor fan to remove the fumes: This method helps ventilate the area and reduce the concentration of dangerous gases.
Step 2
Describe TWO aspects that must be determined when setting out and excavating a trench for sewer pipes.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The slope of the trench: It is crucial to determine the slope to ensure proper drainage and flow of sewage.
Invert levels: These must be correctly set out and verified to ensure that the pipes are at the appropriate depth and slope.
Step 3
Name the member that keeps the poling boards apart when the shoring for a trench is set up.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The member is called a strut, which helps maintain space between the poling boards, ensuring stability during excavation.
Step 4
Identify the type of manhole.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The type of manhole shown in FIGURE 3.4 is a concrete ring manhole.
Step 5
Name ONE manhole accessory that is needed in the construction of the manhole in FIGURE 3.4.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
One necessary accessory is a manhole cover.
Step 6
Describe the process for installing the base of the manhole in FIGURE 3.4 in chronological order.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Excavate the hole: Begin by excavating the site, ensuring it is at least 300 mm wider than the manhole.
Allow for depth: Ensure there is extra depth for the thickness of the base, below the invert level of the drain.
Cast the concrete base: Once the excavation is complete, pour and set the concrete to form the base of the manhole.
Step 7
State ONE condition according to the OHS building regulations, under which the slope of cuttings in permanent excavations can be vertical.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The slope of cuttings can be vertical if the ground conditions are sound, specifically if the soil is intact rock.
Step 8
Explain TWO regulations regarding permanent excavations.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Steepness of slopes: The slope of cuttings in excavations shall not be steeper than 1:2 to prevent collapsing.
Water control: The excavation must be sloped so that no water ponds within 3 m of the toe of the cutting.
Step 9
Calculate the number of bricks required for the manhole using the specifications listed below:
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Determine the area of walls: The centre line length is 6.22 m, and the height is 1.2 m which gives an area of approximately 7.46 m².
Calculate bricks per area: At 50 bricks per m², the total required is:
extTotalbricks=extAreaimesextBricksperm2=7.46imes50=373