Photo AI

4.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Construction - Question 4 - 2023 - Paper 1

Question icon

Question 4

4.1-Choose-a-description-from-COLUMN-B-that-matches-an-item-in-COLUMN-A-NSC Civil Technology Construction-Question 4-2023-Paper 1.png

4.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–L) next to the question numbers (4.1.1 to 4.1.8) in the ANSWER BOOK... show full transcript

Worked Solution & Example Answer:4.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Construction - Question 4 - 2023 - Paper 1

Step 1

4.1.1 Sofit board

96%

114 rated

Answer

K - The sofit board is the base of formwork that carries the load of wet concrete.

Step 2

4.1.2 Cleat

99%

104 rated

Answer

C - The cleat is the member that keeps the sides of formwork in place.

Step 3

4.1.3 Tie

96%

101 rated

Answer

I - The tie is an anchor that prevents the bottom of the cleats from moving.

Step 4

4.1.4 Brace/Strut

98%

120 rated

Answer

G - The brace or strut is a diagonal member of formwork.

Step 5

4.1.5 Fixing plate

97%

117 rated

Answer

F - The fixing plate is used to secure the formwork.

Step 6

4.1.6 Props

97%

121 rated

Answer

A - Props are used to level the formwork.

Step 7

4.1.7 Folding wedges

96%

114 rated

Answer

D - Folding wedges are used to facilitate adjustments in formwork.

Step 8

4.1.8 Releasing oil/form oil

99%

104 rated

Answer

B - Releasing oil is applied to the outside of the formwork for striking.

Step 9

4.2.1 Galvanised sheet metal

96%

101 rated

Answer

Galvanised sheet metal protects the metal against corrosion due to a protective zinc layer.

Step 10

4.2.2 Low-carbon steel

98%

120 rated

Answer

Low-carbon steel has a fine smooth appearance and is easy to weld, which makes it suitable for various applications.

Step 11

4.2.3 High-carbon steel

97%

117 rated

Answer

High-carbon steel is known for its increased strength and hardness, making it ideal for high-stress applications.

Step 12

4.3 Name THREE methods of fixing cladding to a wall.

97%

121 rated

Answer

  1. Adhesive fixing
  2. Face fixing
  3. Proprietary fixing

Step 13

4.4.1 Name the type of test that was carried out on the concrete.

96%

114 rated

Answer

Slump test.

Step 14

4.4.2 Identify the outcome of the test.

99%

104 rated

Answer

True slump.

Step 15

4.4.3 Explain the reason for the outcome.

96%

101 rated

Answer

The true slump profile indicates that the correct amount of water was used.

Step 16

4.5 Name THREE services that should be located before excavations start.

98%

120 rated

Answer

  1. Electrical cables
  2. Water pipes
  3. Gas lines

Step 17

4.6 Predict what would happen if heavy rain occurs during the excavation of a trench.

97%

117 rated

Answer

Excavation can fill up with water, making conditions slippery and increasing the risk of collapses.

Step 18

4.7 Explain why a worker is not allowed to work alone in an excavation.

97%

121 rated

Answer

It is a safety risk; no one would be able to help in case of an emergency.

Step 19

4.8.1 Identify this machine.

96%

114 rated

Answer

This machine is a plate compactor.

Step 20

4.8.2 Describe how you should operate this construction machine without injuring yourself.

99%

104 rated

Answer

Operate with care, ensure a balanced stance, and wear proper PPE while avoiding placing hands or feet near moving parts.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;