Start this question on a NEW page. 5.1 Name the machine that is used to create a splatter-dash finish. FIGURE 5.2 below shows the construction detail to plaster th... show full transcript

Worked Solution & Example Answer:Start this question on a NEW page - NSC Civil Technology Construction - Question 5 - 2021 - Paper 1

Step 1

5.1 Name the machine that is used to create a splatter-dash finish.

96%

114 rated

Answer

The machine used to create a splatter-dash finish is known as the Tyrolean machine. This tool is specifically designed to apply a textured finish to surfaces, often used in plastering.

Step 2

5.2 IDENTIFY A to C.

99%

104 rated

Answer

A: Straight edge/Straight plank.

B: Clamp.

C: Brick wall.

Step 3

5.2.2 Explain why a stronger plaster mixture is needed to finish off the reveals.

96%

101 rated

Answer

A stronger plaster mixture is required to finish off the reveals because the reveals are exposed to more movement and rough handling than other parts of the wall. This added strength helps to ensure durability and prevents cracking or flaking of the plaster over time.

Step 4

5.2.3 Name the tool used to finish off the sharp edges after A has been removed.

98%

120 rated

Answer

The tool used to finish off the sharp edges after A has been removed is known as a trowel, specifically an external corner trowel or corner trowel, which helps to create a smooth edge.

Step 5

5.3 Draw in the ANSWER BOOK a neat sketch showing half of a wooden turning piece/centre for a semi-circular arch with closed laggings.

97%

117 rated

Answer

In this sketch, one should depict half of a wooden turning piece with semi-circular features. Ensure to include closed laggings, which should be shown without any gaps between them, allowing for a continuous and firm structure.

Step 6

5.4 ANSWER SHEET 5.4 shows the lintel above the window in a cavity wall.

97%

121 rated

Answer

To create the sectional view, include details such as the DPC, wall ties, and header course. Each element must be accurately placed to show how they interconnect within the cavity wall structure. Ensure the use of a scale of 1:5.

Step 7

5.5 ANSWER SHEET 5.5 shows the outlines of two consecutive brick courses of a one-and-a-half-brick pier built in stretcher bond.

96%

114 rated

Answer

Utilize the provided answer sheet to complete the brick courses, ensuring to follow the stretcher bond pattern precisely. Each course must align correctly with the previous one while maintaining the width and depth appropriate for the one-and-a-half-brick pier.