4.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–L) next to the question numbers (4.1.1 to 4.1.8) in the ANSWER BOOK... show full transcript

Worked Solution & Example Answer:4.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Construction - Question 4 - 2023 - Paper 1

Step 1

4.1.1 Soffit board

96%

114 rated

Answer

K: A soffit board is a member of formwork that prevents the top of shutter board sides from deforming.

Step 2

4.1.2 Cleat

99%

104 rated

Answer

C: A cleat is a member that keeps the sides of formwork in place.

Step 3

4.1.3 Tie

96%

101 rated

Answer

I: A tie is an anchor that prevents the bottom of the cleats from moving.

Step 4

4.1.4 Brace/Strut

98%

120 rated

Answer

G: A brace or strut is a diagonal member of formwork.

Step 5

4.1.5 Fixing plate

97%

117 rated

Answer

F: A fixing plate is a base of formwork that carries the load of wet concrete.

Step 6

4.1.6 Props

97%

121 rated

Answer

A: Props are applied to the outside of the formwork for striking.

Step 7

4.1.7 Folding wedges

96%

114 rated

Answer

D: Folding wedges are used to level the formwork.

Step 8

4.1.8 Releasing oil/Form oil

99%

104 rated

Answer

B: Releasing oil is applied inside of formwork to ease the stripping.

Step 9

4.2.1 Galvanised sheet metal

96%

101 rated

Answer

Galvanised sheet metal protects metal against corrosion due to its shiny bluish-white surface.

Step 10

4.2.2 Low-carbon steel

98%

120 rated

Answer

Low-carbon steel is malleable and easy to weld, making it suitable for various construction applications.

Step 11

4.2.3 High-carbon steel

97%

117 rated

Answer

High-carbon steel has increased strength and hardness, making it ideal for heavy-duty applications.

Step 12

4.3 Name THREE methods of fixing cladding to a wall.

97%

121 rated

Answer

  1. Adhesive fixing
  2. Face fixing
  3. Proprietary fixing

Step 13

4.4.1 Name the type of test that was carried out on the concrete.

96%

114 rated

Answer

The type of test is a slump test.

Step 14

4.4.2 Identify the outcome of the test.

99%

104 rated

Answer

The outcome of the test is a true slump.

Step 15

4.4.3 Explain the reason for the outcome.

96%

101 rated

Answer

The true slump occurs when the correct amount of water was used.

Step 16

4.5 Name THREE services that should be located before excavations start.

98%

120 rated

Answer

  1. Electrical cables
  2. Water pipes
  3. Gas lines

Step 17

4.6 Predict what would happen if heavy rain occurs during the excavation of a trench.

97%

117 rated

Answer

Heavy rain can cause the excavation to fill up with water, leading to slippery conditions and possible mudslides.

Step 18

4.7 Explain why a worker is not allowed to work alone in an excavation.

97%

121 rated

Answer

A worker is not allowed to work alone because it is a safety risk; no one will be able to provide assistance in case of an emergency.

Step 19

4.8.1 Identify this machine.

96%

114 rated

Answer

The machine is a plate compactor.

Step 20

4.8.2 Describe how you should operate this construction machine without injuring yourself.

99%

104 rated

Answer

Operate the machine with care, ensuring to wear appropriate personal protective equipment (PPE) and maintain a firm and well-balanced stance.

Step 21

4.9 Use ANSWER SHEET 4.9 and draw the completed formwork for the beam and floor slab.

96%

101 rated

Answer

This requires a diagram that accurately represents the formwork for the concrete beam and floor slab.