5.1 FIGURE 5.1 below shows the construction detail at the foot of a centre. Identify parts A to E. 5.2 Justify the use of an adjustable steel prop rather than a woo... show full transcript

Worked Solution & Example Answer:5.1 FIGURE 5.1 below shows the construction detail at the foot of a centre - NSC Civil Technology Woodworking - Question 5 - 2020 - Paper 1

Step 1

Identify parts A to E

96%

114 rated

Answer

In FIGURE 5.1:

  • A – Rib
  • B – Tie/Opening between ribs
  • C – Lagging
  • D – Bearer
  • E – Horizontal brace/Strut

Step 2

Justify the use of an adjustable steel prop rather than a wooden prop when installing formwork

99%

104 rated

Answer

An adjustable steel prop is preferred for several reasons:

  1. Strength: Steel props are stronger than wooden ones, providing better support under heavy loads.
  2. Adjustability: They are easier to adjust compared to wooden props, allowing for precise height adjustments during installation.
  3. Accuracy: Steel props provide a more accurate support level, which is essential for structural integrity.

Step 3

Name ONE type of shoring other than dead shoring

96%

101 rated

Answer

One type of shoring other than dead shoring is double flying shore.

Step 4

Explain the use of A

98%

120 rated

Answer

A refers to the folding wedges, which are used for raising or lowering the dead shore to the required height, ensuring that the structure maintains its integrity and alignment.

Step 5

Describe the purpose of B

97%

117 rated

Answer

B represents a needle shore, which is used to secure the joint between the soleplate and the dead shore, contributing to the rigidity and stability of the entire setup.

Step 6

Redraw the table below in your ANSWER BOOK and identify TWO possible mistakes in the construction of the dead shore AND recommend possible solutions

97%

121 rated

Answer

NO.MISTAKES IN THE CONSTRUCTION OF THE DEAD SHOREPOSSIBLE SOLUTIONS TO RECTIFY THE MISTAKES
1The dead shores have no soleplates.Sole plates should be installed at the bottom of the dead shores.
2The needle does not rest properly on the dead shore.Move the dead shore to the left and ensure the needle is positioned correctly on dead shore.

Step 7

Differentiate between a couple roof truss and a collar-tie roof truss

96%

114 rated

Answer

The differences can be illustrated as follows:

Couple Roof Truss

      Ridge Beam
          /
         / \
       /   \
   Rafter    Rafter
      |          |
      Wall      Wall

In this design, there are rafters that meet at the peak, creating a triangle shaped roof structure.

Collar-Tie Roof Truss

      Ridge Beam
          /
         / \
       /   \
   Rafter    Rafter
      |          |
      Collar Beam
      |          |
      Wall      Wall

In this design, there is an additional collar beam that supports the rafters, offering extra strength and stability.

Step 8

Draw a vertical section through the formwork for an in-situ cast concrete floor

99%

104 rated

Answer

The drawing should include:

  • A cross-bearer and bearer to support the formwork.
  • The dimensions and proportions must be accurate for the concrete floor's support requirements. Ensure to label all parts correctly in the drawn diagram, maintaining clarity on load distribution.