3.1 Give ONE word/term for each of the following descriptions by choosing a word/term from the list - NSC Civil Technology Woodworking - Question 3 - 2019 - Paper 1
Question 3
3.1 Give ONE word/term for each of the following descriptions by choosing a word/term from the list. Write only the word/term next to the question numbers (3.1.1 to ... show full transcript
Worked Solution & Example Answer:3.1 Give ONE word/term for each of the following descriptions by choosing a word/term from the list - NSC Civil Technology Woodworking - Question 3 - 2019 - Paper 1
Step 1
3.1.1 The thickness of melamine used for cupboard doors
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The thickness of melamine used for cupboard doors is commonly 16 mm.
Step 2
3.1.2 To close the opening where the wall panel and the floor meet
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The term used to close the opening where the wall panel and the floor meet is skirting.
Step 3
3.1.3 The area of the roof underlay for a lean-to roof of 2,5 m x 3 m
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
To calculate the area of the roof underlay, we use the formula:
Sign up now to view full answer, or log in if you already have an account!
Answer
To find the number of ridge plates needed, we use the formula:
ext{Number of ridge plates} = rac{ ext{Width of roof covering}}{ ext{Length of one ridge plate}} = rac{8.3 ext{ m}}{1.8 ext{ m}} \ ext{which gives approximately } 4.61 \ ext{ plates.}
Thus, 5 ridge plates of 1.8 m long are needed.
Step 7
3.4 Vertical section of the wall panel
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
A well-proportioned sketch of the vertical section through the top part of the wall panel should clearly depict:
The wall with a thickness marked.
The capping present at the top.
Rough ground details shown.
A tongue and groove board indicating the panel structure.
Ensure correctness in the drawing for full marks.
Step 8
3.5 Framework of a built-in cupboard without the doors
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The drawing for the framework of a built-in cupboard should include:
A top shelf extending fully across.
An intermediate side situated in the middle.
Designated hanging space on the left side.
An oval hanging rail included.
A total of four shelves correctly spaced below the top, along with two drawer units positioned below the shelving.
Ensure that the completion maintains good proportion and is drawn correctly to meet assessment criteria.