VRAAG 2: GRAFIKA AS KOMMUNIKASIEMMIDDEL (GENERIES)
Begin hierdie vraag op 'n NUWE bladsjy - NSC Civil Technology Woodworking - Question 2 - 2023 - Paper 1
Question 2
VRAAG 2: GRAFIKA AS KOMMUNIKASIEMMIDDEL (GENERIES)
Begin hierdie vraag op 'n NUWE bladsjy.
FIGUUR A en FIGUUR B op die volgende bladsjy toon tekeninge wat op 'n bou... show full transcript
Worked Solution & Example Answer:VRAAG 2: GRAFIKA AS KOMMUNIKASIEMMIDDEL (GENERIES)
Begin hierdie vraag op 'n NUWE bladsjy - NSC Civil Technology Woodworking - Question 2 - 2023 - Paper 1
Step 1
Give ONE reason why FIGURE B represents the first floor plan.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Figure B shows the layout of rooms and dimensions indicating it is the first floor of the building.
Step 2
Name the SI unit that is used to indicate dimensions on building plans.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The SI unit used to indicate dimensions on building plans is the millimetre (mm).
Step 3
Identify number 3.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 3 is identified as a sliding door or patio door.
Step 4
Identify the number indicating the emergency exit.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The number indicating the emergency exit is 2.
Step 5
What is the purpose of number 3?
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The purpose of number 3 is to provide access to the balcony and to enhance the aesthetic of the living space.
Step 6
Identify number 4.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 4 is identified as a window sill.
Step 7
Identify number 5.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 5 is identified as a gutter.
Step 8
Identify number 6.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 6 is identified as a downpipe or rainwater pipe.
Step 9
Identify number 7.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Number 7 is identified as a balcony or cantilever slab.
Step 10
Determine the dimensions from the window schedule of dimensions of the window that is installed at number 8.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The dimensions of the window installed at number 8 are 900 mm × 600 mm or 0.9 m × 0.6 m.
Step 11
Who is the owner of the new dwelling?
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The owner of the new dwelling is Mr. Ntombi.
Step 12
Name the elevation where the sink is located.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The sink is located at the east elevation.
Step 13
Identify the safety error in FIGURE A.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The safety error in FIGURE A is that there are no balustrades or safety rails on the balcony.
Step 14
Deduce from the building plan why it was not approved after the first submission.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The building plan was not approved after the first submission because the drawing of the internal staircase was omitted.
Step 15
How many signatures must be indicated on this building plan?
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
There should be 2 signatures indicated on the building plan.
Step 16
What are the dimensions for the balusters as indicated by the architect?
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The dimensions for the balusters are Ø 50 mm × 1200 mm.
Step 17
Name the material that must be used for the final finishing of the outside wall.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The material to be used for the final finishing of the outside wall is plaster and paint.
Step 18
Describe the end shape of the balustrades.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The end shape of the balustrades is round or circular.
Step 19
How many hinged openings are indicated on Window 1 in the window schedule?
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
There is one hinged opening indicated on Window 1 in the window schedule.
Step 20
Draw the symbol for finished wood for the boardroom table.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The symbol for finished wood for the boardroom table is represented with a textured pattern.
Step 21
Draw the electrical symbol for a three-pole one-way switch.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The electrical symbol for a three-pole one-way switch is a circle with three lines indicating the poles.
Step 22
How many fluorescent tubes are indicated in the office?
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
There are 2 fluorescent tubes indicated in the office.
Step 23
Calculate the total height of the wall on the left side of the building from the finished floor level. Give your answer in meter.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The total height of the wall on the left side is calculated as:
2955+2955+3000=8.91extm
Step 24
Calculate thearea of the exterior wall on the ground floor, that will consist of bricks, from the finished floor level to the top of the floor slab in the south elevation in FIGURE A. Show ALL calculations.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!