6.1 Name FOUR responsibilities of the architect which must be reflected in the sketch drawings of the design of a structure - NSC Civil Technology Woodworking - Question 6 - 2017 - Paper 1
Question 6
6.1 Name FOUR responsibilities of the architect which must be reflected in the sketch drawings of the design of a structure.
6.2 Make neat sketches to illustrate th... show full transcript
Worked Solution & Example Answer:6.1 Name FOUR responsibilities of the architect which must be reflected in the sketch drawings of the design of a structure - NSC Civil Technology Woodworking - Question 6 - 2017 - Paper 1
Step 1
Name FOUR responsibilities of the architect which must be reflected in the sketch drawings of the design of a structure.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Determine the needs of the owners: An architect must recognize and interpret the specific requirements and desires of the clients for the project.
Determine the arrangement of rooms: This includes planning the layout and flow of spaces in a manner that maximizes usability and comfort.
Determine the arrangement of windows and doors: Architects must carefully select the locations of windows and doors for light, ventilation, and aesthetic appeal.
Show dimensions: All drawings must include precise measurements to ensure the structure is built accurately.
Step 2
6.2.1 Water closet
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
A water closet symbol typically resembles a simplified outline of a toilet. It shows a circular bowl with an attached tank above it.
Step 3
6.2.2 Sink
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The sink symbol is generally a rectangular box representing the basin with an outlined faucet above it, indicating water flow.
Step 4
6.2.3 Water meter
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The water meter symbol can be depicted as a circular shape with lines indicating connections to water pipes, often illustrated with a 'W' inside to signify water flow.
Step 5
6.3 In which working drawing is the entrance to a site indicated?
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The entrance to a site is indicated on the site plan.
Step 6
6.4 Draw, on SHEET D, the south elevation on scale 1:50.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
To draw the south elevation:
Start from the given ground level line and measure upwards to mark the floor level at 200 mm.
From this point, measure up to 2 600 mm for the wall height.
Indicate openings for the window and door, using their respective dimensions: window 1 (600 mm x 200 mm) and door 1 (1 400 mm x 200 mm).
Include the roof pitch of 30°, indicating the roof's construction line.
Finally, label all components for clarity, ensuring to position the gable end correctly at the west elevation and depict the hipped roof at the east elevation.